Project Management Studies

Assignment Overview

Scenario

Proposed Halls of Residence

L&D are a medium sized contracting company with a wealth of experience in Civil Engineering and Construction projects, quality assurance forms the foundation in which they are synonymous in their reputation.

The University campus at docklands has now been completed; the university is expanding and has decided to construct a new university to support its growth and expansion at a new location.

The construction of the new halls of residence is under Design and Build; you have been provided with the original schematic drawing and layout for the project.

The project is subdivided into three categories’;

Superstructure.

Finishes/curtain walling

You are responsible for one of these sections as outlined in the class, the student who undertakes section one will be the overall Project Manager. You will be expected to provide a master programme (at the presentation) on excel or similar merging all students previously submitted programmes as one.

Assignment submission, On- line submission. (Individual)

Part 2A –Individual submission

Section 2   Finishes /Curtain Walling -Student

3.   (a)      Produce a detailed method statement (project specific) for 3 main

activities within your section supported by detailed pictorials, identify

any risk within this section and provide a solution on how to minimize them.                                                                                             

                                                                                                           20 marks     

       (b)      Design a Project Logic plan for your part of the works along

                 with a Logistics Plan for the following:-

       Delivery of materials to site, unloading and movement of materials 

       on site to their final destination.                                 15 marks

       (c)       Design a SWM plan for your section of works, you are to include 

                  the following with a brief overview of each section:  

                                Plan and prepare

                                    Allocate responsibility

                                    Identify Waste

                                    How will the waste be managed?

                                    Identify how to dispose of the waste.

                                    Organise materials and waste

                                    Communicate plan and carry out training

                                    Measure your waste and update SWMP

                                    Review and improve.

Discuss who is responsible for the plan and how long it should be kept for after project completion.

                                                                                                                    15 marks

     (d)      Discuss with calculations a method to preserving water within the

                building.                                                                                      20 marks