Value Stream

Details
Instructions
For this assignment, select a value stream in your organization that can benefit from analysis and improvement. The value stream (or end-to-end process) selected does not need to be overly large or complex. Select something that has the potential for meaningful improvement but is manageable within the scope of this assignment.

  1. Develop a current state Value Stream Map of your selected value stream. Show the information flow, workflow, and summary timeline on the map.
  2. Document key metrics for each process block:
    a. Process time (PT) – these are estimates provided by YOU based upon what you know of the process.
    b. Lead time (LT) – these are estimates provided by YOU based upon what you know of the process.
  3. Calculate the current state summary metrics:
    a. Total lead time (Total LT)
    b. Total process time (Total PT)
  4. Describe the current state of the value stream, and highlight any performance deficiencies and challenges, such as delays, excessive WIP, bottlenecks, capacity, and workload imbalances, rework, poor quality yields, long lead times, and other operational
    Review Value Stream Map Tips on Topics Download Value Stream Map Tips on Topics, Value Stream Map FAQ Download Value Stream Map FAQ, Value Stream Map Template Download Value Stream Map Template, and Value Stream Map Example Download Value Stream Map Example. Please let me know if you are able to open these links. If not, I can send them individually to you.

Do you need help with this assignment or any other? We got you! Place your order and leave the rest to our experts.

Quality Guaranteed

Any Deadline

No Plagiarism